The cap and columns of the east campground bridge abutment were cast, the surrounding areas began to be backfilled and compacted, and the riprap revetment began to be constructed. The remaining crib dam logs were removed from the bank, and the surrounding areas and access was regraded. Access roads throughout the site were rapped.