General Site Photography

General - Spring 2018
Flows through dam notch 4-16
Flows through dam notch 4-16
Closeup of back channel log jam 4-16
Closeup of back channel log jam 4-16
Creek Channel Scouring Upstream 4-25
Creek Channel Scouring Upstream 4-25
Log jam blocking back channel 4-25
Log jam blocking back channel 4-25
Closeup of back channel log jam 4-25
Closeup of back channel log jam 4-25
Elk Creek - 4-25
Elk Creek - 4-25
Opening up the back channel 4-26
Opening up the back channel 4-26

 


 

General - December 2017
IMG 0282
IMG 0280
IMG 0279
IMG 0278
IMG 0277
IMG 0276

 


 

General - September 2017
Concrete Debris from Dam
Concrete Debris from Dam
Installing Upstream Toe Protection
Installing Upstream Toe Protection
Exposed Bank from Dropping Water Levels
Exposed Bank from Dropping Water Levels
Bolting Upstream Structures
Bolting Upstream Structures
Hand-Hewn Log from Timber Crib Dam
Hand-Hewn Log from Timber Crib Dam
Installing Sediment Jetting Nozzles
Installing Sediment Jetting Nozzles
Testing Sediment Jetting
Testing Sediment Jetting

 


 

General - August 2017
Setting Barge Modules
Setting Barge Modules
Installing Barge Spuds
Installing Barge Spuds
Barge Modules Arriving
Barge Modules Arriving
Smoky Sullivan Lake
Smoky Sullivan Lake

Partners


Pend Oreille Public Utility District Logo           Seattle City Light Logo           Forest Service Logo

The Envirocon Design – Build Team


Envirocon Logo           ESA Logo           Natural Systems Design Logo           Mead And Hunt Logo

Copyright © 2023 Mill Pond Dam.