Project Update 10-29-2018

The west campground bridge abutment was completed. At the east abutment, previously placed boulders were removed, silt was then washed from the boulders and the excavation, the boulders were then replaced. Terrace trails were completed as the roads intersecting them were decommissioned. ELJ construction continues. Trees and sedges salvaged in the spring were planted throughout the site. Portions of the floodplain were graded to design widths. The stockpiled bulkbags at the LeHigh site were hauled to Mill Pond and emptied. Smaller demobilization activities continued throughout the week; picking up miscellaneous trash, debris, tools, unused supplies.

 

Partners


Pend Oreille Public Utility District Logo           Seattle City Light Logo           Forest Service Logo

The Envirocon Design – Build Team


Envirocon Logo           ESA Logo           Natural Systems Design Logo           Mead And Hunt Logo

Copyright © 2025 Mill Pond Dam.