Additional woody debris were removed from the banks at the location of the old log crib dam. Haul roads through the upper portions of the site were razed. The forms were stripped from the columns at the east campground bridge abutment. Fill was placed and compacted at both the east and west abutments, while the stone revetments were installed. A rebar cage for the final pour was placed and form work was begun.