Mill Pond Dam Project

Mill Pond Dam Project

  • About
    • Objectives & Goals
  • Updates
  • Progress Gallery
    • Delta Camera
    • Pond Camera
    • General Site Photography
    • Project Videos
  • Schedule
  • Contact

Project Update 11-19-2018

Additional woody debris were removed from the banks at the location of the old log crib dam. Haul roads through the upper portions of the site were razed. The forms were stripped from the columns at the east campground bridge abutment. Fill was placed and compacted at both the east and west abutments, while the stone revetments were installed. A rebar cage for the final pour was placed and form work was begun.

Partners


Pend Oreille Public Utility District Logo           Seattle City Light Logo           Forest Service Logo

The Envirocon Design – Build Team


Envirocon Logo           ESA Logo           Natural Systems Design Logo           Mead And Hunt Logo

Copyright © 2025 Mill Pond Dam.