Envirocon crews graded the picnic shelter area and constructed and crane pad at the historic dam location. Crane subcontractor mobilized a 450 ton crane to the campground for the pedestrian bridge placement.
Mill Pond Dam Project
Envirocon crews graded the picnic shelter area and constructed and crane pad at the historic dam location. Crane subcontractor mobilized a 450 ton crane to the campground for the pedestrian bridge placement.