Envirocon crews constructed the trail from the dam area parking to the lower terrace trail, graded road cut slopes, and constructed additional engineered log jam at the upper reaches of the site.
Mill Pond Dam Project
Envirocon crews constructed the trail from the dam area parking to the lower terrace trail, graded road cut slopes, and constructed additional engineered log jam at the upper reaches of the site.