Project Update – 6/8/18

The majority of the work consisted of collecting planting medium as well as sand and gravel from the delta and stockpiling it in upland areas to the south. Timber from the site was collected and categorized for future use in ELJ structures, areal survey was conducted to inform the development of the final floodplain design, and a starter channel was dug to erode sediment deposited at the mouth of Sullivan Creek as it meets the Pend Oreille River.