ELJ structures continued to be constructed in the middle reach of the site. Began excavating the upper floodplain and continued starter channel excavation in the lower reach.
Mill Pond Dam Project
ELJ structures continued to be constructed in the middle reach of the site. Began excavating the upper floodplain and continued starter channel excavation in the lower reach.