Engineered log jams continued to be installed at the middle reaches of the floodplain, with adjustments being made to their construction given varying subsurface conditions. Trees with root wads were collected from an offsite location and delivered to the project site. A series of starter channels were excavated at the lower reaches of the floodplain to erode impounded sediment just upstream from the dam. An island of deposited sand was partially graded and stockpiled for use around the site.