Project Update – 9/17/2017

The pedestrian bridge over the Mill Pond Dam was removed and a debris catchment net (Photo 1) was installed in advance of demolition of the dam. Upstream of Mill Pond Dam, Sullivan creek was rerouted to an abandoned channel (Photo 2) so that work on the delta could be completed in the dry (Photo 3), where trees were cleared and starter channels were excavated (Photo 4). These starter channels will be utilized to move the 100+ years of impounded sediments downstream during dam removal.