Project Update – 9/23/17

Work continued, preparing for the drawdown of Mill Pond and the release of water from Sullivan Lake. The timber crib dam continued to be removed (Photos 1 & 2). Work continued fortifying upstream unstable slopes with large woody structures (Photo 3). Work began constructing log jams to influence Sullivan Creek when it is put to the excavated starter channels (Photo 4). The delta continued to be cleared of vegetation to prevent it from washing downstream (Photo 5). Downstream, a rockery was constructed to stabilize a bank adjacent to Sullivan Lake Road (Photo 6).

Partners


Pend Oreille Public Utility District Logo           Seattle City Light Logo           Forest Service Logo

The Envirocon Design – Build Team


Envirocon Logo           ESA Logo           Natural Systems Design Logo           Mead And Hunt Logo

Copyright © 2025 Mill Pond Dam.