Design build contractor continued grading efforts and manual manipulation of flow paths to evacuate sediment in the delta. Design team on site to continue evaluation of historic creek location.
Design build contractor continued grading efforts and manual manipulation of flow paths to evacuate sediment in the delta. Design team on site to continue evaluation of historic creek location.
Design build contractor continued grading efforts and manual manipulation of flow paths to evacuate sediment in the delta. Design team on site to continue evaluation of historic creek location.
A small crew was mobilized to the site for the 2018 season. The crew used an excavator with a hammer attachment to continue demolition of the concrete dam. The goal of the demolition task was to lower the water elevation to assist with sediment evacuation prior/ during the spring high flows.