Project Update 4-26-2019

Small Envirocon crew onsite prepping offices and tool trailers for the 2019 work.

Project Update 12-3-2018

All crewmembers and equipment was demobilized from the site and site was shut down for the winter month.

 

Project Update 11-26-2018

Demobilization activities were continued.

 

Project Update 11-19-2018

Additional woody debris were removed from the banks at the location of the old log crib dam. Haul roads through the upper portions of the site were razed. The forms were stripped from the columns at the east campground bridge abutment. Fill was placed and compacted at both the east and west abutments, while the stone revetments were installed. A rebar cage for the final pour was placed and form work was begun.

Project Update 11-12-2018

The cap and columns of the east campground bridge abutment were cast, the surrounding areas began to be backfilled and compacted, and the riprap revetment began to be constructed. The remaining crib dam logs were removed from the bank, and the surrounding areas and access was regraded. Access roads throughout the site were rapped.

  • « Previous Page
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • …
  • 13
  • Next Page »

Partners


Pend Oreille Public Utility District Logo           Seattle City Light Logo           Forest Service Logo

The Envirocon Design – Build Team


Envirocon Logo           ESA Logo           Natural Systems Design Logo           Mead And Hunt Logo

Copyright © 2025 Mill Pond Dam.